Hi,
I've been working on a film - editing at 24fps. Another editor wishes to switch the project to 23.98(23.976)fps. If I convert existing footage to 23.98, will it link up frame for frame with the original 24fps edits? I'm asuming not. I don't have any experience with 23.98.